|
|
www.donaldbinks.com.au |
|
THE HOUSE page 2 |
|
|||||||
|
THE NEW CARPET AND THE BREAKFAST TABLE (2/11/07) |
||||||||
|
THE GARAGE (JULY 2007) |
||||||||
|
BOOKCASES |
||||||||
| At long last the dingy, dirty, dreary, droll, decrepit dregs of the old carpet were removed from the accommodation wing on Thursday, 1st November, 2007 and replaced with a new deep blue plush pile carpet. (Blue was chosen as it will match the velvet curtains in two of the rooms). |
![]() |
|||||||
| The actual ripping out of the old carpet, laying the underlay and the new carpet only took a few hours. The worst part of the job was removing the furniture prior to and then putting it all back again. In this latter endeavor I must thank Mr. Alan Rogers who rendered much needed assistance. |
![]() |
![]() |
||||||
| Here is a photograph of the 'breakfast room table and chairs' a project Donald worked on and did all by himself. (It's amazing that it doesn't look too bad.) |
![]() |
|||||||
| The Garage was erected on the concrete slab (see below) on Friday 13th July. |
![]() |
![]() |
![]() |
|||||
| Preparation of site for a garage and drinking water tank. |
![]() |
![]() |
![]() |
![]() |
||||
| Excavation & leveling | for the garage has been | completed. Rocks are | for a retaining wall | |||||
| A slab is poured on to which the garage will be erected. |
![]() |
![]() |
![]() |
![]() |
![]() |
|||
| Concrete slab poured & | rock retaining wall erected. | A rock retaining wall at t | he end of the driveway. | |||||
| The Cabinet Maker has finished the Bookcases in both the Drawing Room and Television Room |
![]() |
![]() |
![]() |
|||||